OGBELE INTEGRATED FACILITY FLARE METERING - FRONT END ENGINEERING DESIGN
The front-end engineering design for the Ogbele integrated facility flare metering system shall be achieved such that there is minimum disruption to the current oil and gas production and within a secure, safe, and healthy working environment. This Scope of Work covers the minimum requirements for the overall WORKS, including the process simulations, process calculations, piping specifications, piping and instrumentation drawings, piping isometric drawings, and flowmeter sizing calculation, described herein for which the FEED contractor is fully responsible.Status: On-going