Energia

Provision of Frontend Engineering Design for the Upgrade of Ebendo Flow Station

A comprehensive review of all engineering documents executed to date for the proposed flow station upgrade, and developed a Master Deliverable Register (MDR) that encompasses all necessary FEED design reports, drawings, and other documentation required to meet the company's expectations for the FEED phase of the proposed flow station upgrade project.

Status: On-going

EBENDO NORTH PIPELINE AND GATHERING SYSTEM - FRONT END ENGINEERING DESIGN

The front-end engineering design for the Ebendo North pipelines and gathering system to accommodate new wells from the Northern axis of the Ebendo field. This Scope of Work covers the minimum requirements for the overall WORKS, including concept design review, process simulations, process calculations, mechanical design, equipment and piping specifications, plant layout design, instrumentation and control design, civil/structural designs, material selection, pipeline design, cost estimation for the EPC phase, described herein for which the Engineering Design Contractor is fully responsible.

Status: Completed