CHAZOP for OML 100 ICSS Upgrade Study

  • Year

    2016
  • Project Status

    Completed

The objective of the CHAZOP is to re-view the modified control systems functionality, specifications and operability, and to identify major hazards and opportunities of alternative options towards an inherently safe design within the OML 100 ICSS Upgrade project, which includes:

  • Upgrading of the existing Distributed Control System to an Integrated Control Safety System;
  • Installing an ICSS for ease of maintenance