Engineering Design of Macerator Installation

  • Year

    2016
  • Project Status

    Completed
  • MOBILISATION, SITE VISIT/INVESTIGATION.
  • Installation study
  • Tie-in Study (Portable water & Utility Air)
  • Basis of Design
  • Eng. Management and Cost Estimation
  • Progress review meeting with client (6 weeks x 3)
  • Constructibility/Installation review (if necessary)