Year
2016Project Status
Completed
The scope of work included redlining of the existing As-Built PIDs which has already been done by the COMPANY. The Native copy, marked up drawings in Hard Copy PDF were handed to QEDI after the KoM. QEDI carried out PID UPDATE for: ODP1, ODD1, AFD1, IMD1, EDD1 & OFS (Obagi). About 68 PIDs were involved in this Update. Production of Appropriate Drawing Templates for all Drawings was done. Provision of smart index for easy search and navigation was required and the Submission of final As-Built in 8 Sets of Hard copies and 1 set of electronic copy in DISK was the requirement for issuance of a JPC.