Year
2016Project Status
On-going
Project is designed to put in a 14” bypass connection from LP sepa-rator to the LP suction scrubber on 3 gas trains and install a 3” line between the deoxygenated line to the LP separator on 3 lines.
To complete conceptual / feed design for review and construction review. Of Piping and structural works. To complete all flow calcu-lations and review with DWFE en-gineers. On approval of concept and first design to complete detail design ready for fabrication. This will require a site visit to get meas-urements and field survey.