Year
2016Project Status
Completed
- Company request for a design of a prefabricated access platform with a roof extension to cover the LACT sample point area on Agbami FPSO.
- The platforms will be like the prefabricated platforms for the turbine enclosure entrance door platforms. This platform should be caple of supporting the weight of a minimum of two persons.
The rain roof cover for the sample point will cover the sample takeoff point to avoid sample contamination during the rainy season.